|
Future
Developments |
|
|
|
|
| |
Port
Installation |
 |
| |
| |
|
|
|
|
|
|
|
|
|
|
| | |
| |
| |
| |
| |
| |
| |
| |
|
|
|
|
|
|
|
|
|
|
| | |
| |
| |
| |
| |
| |
| |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
| |
A fleet of eight ferries, namely Pulau Pinang, Pulau Payar, Pulau Angsa, Pulau Kapas, Pulau Rimau, Pulau Undan, Pulau Rawa and Pulau Talang-Talang ply the waters. Penang Port is unique, in that it is the only port in Malaysia that runs a ferry service, linking Georgetown on Penang Island (Pengkalan Raja Tun Uda) and Butterworth on the mainland (Pengkalan Sultan Abdul Halim)
PPSB operates a fleet of eight ferries, with the first ferry departure from Butterworth at 0600 hours, with the last at 0030 hours; and the first departure from Penang Island at 0530 hour, with the last at 0100 hour. |
| |
|
| |
Penang
Port Sdn. Bhd.(PPSB) operates a fleet of eight
ferries,with details as listed below:- |
| |
Pulau
Undan |
Pulau
Talang-talang
|
Pulau
Angsa |
Pulau
Rawa
|
Pulau
Rimau |
Pulau
Kapas |
Pulau
Pinang |
Pulau
Payar
|
|
| |
Rates |
| |
Ferry
rates applicable with effect from 1 November
1996 are as follows :- |
| |
| PEDESTRIAN |
Adult |
RM1.20 |
Children
(between 5 to 12 years old) |
RM0.60 |
|
|
| |
| SEASON
TICKETS (PEDESTRIANS) – valid
for two months from date of issue |
Adult |
RM30.00 |
|
|
| |
| VEHICLES |
Bicycle |
RM1.40 |
Motorcycle
(inclusive of pillion rider) |
RM2.00 |
Trishaw/tricycle |
RM3.00 |
Motorcar
(including station wagon, four-wheel
drive, three-wheel commercial
vehicle, motorcycle with side
car) |
RM7.70 |
Lorry
(2 axles with 4 wheels) |
RM13.20 |
Lorry
(2 axles with 6 wheels) |
RM27.50 |
|
|
| |
For more information, please contact :- |
| |
Head Ferry Unit |
| |
Tel: +604-310 2360 |
| |
Fax: +604-324 0255 |
| |
|
| |
Manager – Business and Administration |
| |
Tel: +604-610 2363 |
| |
Fax: +604-324 0255 |
| |
|
| |
Executive – Operations |
| |
Tel: +604-310 2364 |
| |
Fax: +604-324 0255 |
| |
|
| |
Pengkalan Raja Tun Uda ( Penang Island ) |
| |
Hotline: +604-2102 363 |
| |
|
| |
Pengkalan Sultan Abdul Halim (Butterworth) |
| |
Hotline: +604-3102 377 |
| |
|
|
|
| |
|
| |
SWETTENHAM PIER: |
| |
|
| |
Penang
Port handles some of the largest cruise vessels
in the world at Swettenham Pier on Penang Island.
At present, Swettenham Pier has a linear berth
of 366 metres in length and an alongside depth
of 9.5 metres ACD.
Penang
Port plans to redevelop Swettenham Pier into an
international cruise terminal to cater for larger
cruise vessels. The proposed 450 metre long t-shaped
berth will be able to handle vessels carrying
more than 2,000 passengers. Land-based facilities
to be provided under this Swettenham Pier redevelopment
project will include hotels, shopping outlets,
and handicraft shops.
To
complement Swettenham Pier, Penang Port will also
be involved in the construction of a public marina
at Church Street Pier. Once completed, the marina
will be capable of accommodating 90 boats and
yachts ranging between 10 to 40 metres in length |
| |
|
| |
SWETTENHAM PIER, PENANG REDEVELOPMENT PROJECT:-
Planning approval application was submitted to Jabatan Perancangan Bandar dan Desa Negeri (JPBD) on June 22, 2005. This project was approved by Jawatankuasa Teknikal Perancangan (JPBD Semenanjung) on August 29, 2005. Majlis Pembangunan Fisikal Negara (MPFN) had approved this project on October 6, 2005.
Site Submission Date : 2nd of May 2006
Contruction Completion Date : 2nd of November 2006
Operation Beginning Estimation Date : early January 2006
Swettenham Pier, Penang that was built around year 1903 and received an infrastructure upgrading from time to time according to its need, had achieved its maximum limit and utility capacity. It is proposed to redevelop this pier and improve its position to a wider Terminal Cruise and manage to serve 3 passenger ships at one time, not included other medium size ships and international ferries.
The proposed redevelopment comprises 3 levels terminal building that can serve passengers from ships and ferries and ferries and able to accepts 2,500 to 3,000 passengers within a particular time. It shall be completed with variety of infrastructures, passengers'space, services' space and operations' space. |
| |
Contact |
| |
| NAME
/ DESIGNATION |
TEL |
FAX |
EMAIL |
| Md Suyod Suhaimi (Head - Swettenham Pier
Redevelopment |
042102246 |
042634792 |
suyod@penangport.com.my |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|